Built to Australian Standards. Tested to Exceed Them.

Every GreenBox product is designed, manufactured and tested to meet or exceed AS/NZS requirements — with full documentation and traceability.

OUR PHILOSOPHY

Quality is not a final inspection. It's every step of our process.

A protection product that fails in the field is worse than no product at all. That’s the standard we hold ourselves to — which is why quality controls are embedded at every stage of design, procurement, manufacturing, and testing, not just at the end.

Design Quality

Engineering drawings reviewed and approved before any production begins. Changes require formal design review sign-off.

Material Quality

Components sourced from our approved supplier list only. Incoming goods inspection on all batches before they enter production.

Manufacturing Quality

Stage-by-stage build sign-off by trained technicians following approved build documentation at every workstation.

Documentation Quality

Test reports, circuit diagrams, and compliance certificates reviewed for completeness and accuracy before dispatch.

100%

Factory Tested

AS/NZS

Certified Products

6 States

National Coverage

Full

Documentation Supplied

MANUFACTURING PROCESS

Eight steps from brief to dispatch

Every GreenBox product follows the same manufacturing process — because consistency is what produces reliable products, every time.

01

Engineering Design

Every product begins with formal CAD drawings and circuit diagrams produced by our qualified electrical engineers — reviewed against applicable AS/NZS standards before any material is ordered.

02

Material Procurement

Components are sourced exclusively from our approved supplier list. No substitutions are made without an engineering review and updated BOM — ensuring every unit is built to identical specification.

03

Component Inspection

All incoming components are subject to incoming quality checks before they enter our manufacturing process. Out-of-spec components are quarantined and returned before production begins.

04

Assembly

Trained production technicians assemble each unit following approved build documentation. Our assembly process is structured to prevent errors — with stage sign-off at critical checkpoints.

05

Wiring & Termination

All wiring and termination is completed to AS/NZS 3000 Wiring Rules. Cable sizes, termination torques, and labelling are specified in engineering drawings and verified during build.

06

Functional Testing

100% of units undergo functional electrical testing before leaving our facility. This is not a sample check — every single unit is powered up and verified against the engineering specification.

07

Compliance Inspection

A final independent inspection checks that the built unit matches the approved drawings, that all documentation is complete, and that the unit satisfies the relevant AS/NZS standard.

08

Documentation & Dispatch

Every unit is dispatched with its full documentation package — including test reports, compliance certificates, circuit diagrams, and installation instructions.

TESTING PROCEDURES

Every unit. Every test. No exceptions.

We don’t sample-test. Every GreenBox unit undergoes the full testing protocol before it leaves our facility.

Electrical Testing

Fundamental electrical tests performed on every unit before dispatch to verify the build is safe and electrically sound.

Protection Testing

Protection relay and device testing to confirm correct operation at specified pickup levels and within required time tolerances.

Documentation Review

A formal documentation check ensures every unit ships with complete, accurate records that satisfy DNSP and certifier requirements.

AUSTRALIAN STANDARDS

The standards behind our products

We don’t chase compliance as an afterthought. These standards are built into our design process from day one.

AS/NZS 3000:2018

Wiring Rules

Minimum requirements for the design, construction and testing of electrical wiring installations in buildings and structures.

Relevance to GreenBox

All GreenBox boards are wired and terminated to this standard. Documentation confirms compliance on every unit.

AS4777.1 & .2

Grid Connection of Energy Systems

Requirements for the connection of inverter energy systems (including solar PV) to the electrical power network.

Relevance to GreenBox

Our grid protection boards are specified to meet AS4777.2 protection requirements across all Australian DNSPs.

AS/NZS 61439

Switchgear & Controlgear Assemblies

Design, construction, and testing requirements for low-voltage switchgear and controlgear assemblies.

Relevance to GreenBox

Our switchboard assemblies and distribution panels are designed and tested to AS/NZS 61439 requirements.

AS/NZS 3008

Electrical Installations — Cable Selection

Methods for selecting cables for electrical installations, including sizing based on current-carrying capacity and voltage drop.

Relevance to GreenBox

Cable sizing in all GreenBox products is calculated and specified to AS/NZS 3008, with references in circuit diagrams.

AS/NZS 1359

Rotating Electrical Machines

Performance requirements and testing methods for rotating electrical machines used in power generation.

Relevance to GreenBox

Relevant to GreenBox products used in generator and microgrid applications requiring machine protection.

AS3823

Power Transformers

Requirements for the performance, construction and testing of power transformers and reactors.

Relevance to GreenBox

Applied to GreenBox transformer products including LV distribution transformers and isolation transformers.

QUALITY CERTIFICATIONS

Verified by independent bodies

Our certifications are independently assessed and regularly renewed — so you can verify our credentials, not just take our word for them.

FAQ

Common quality questions

Answers to the questions our clients most frequently ask about testing, documentation, warranties, and compliance.
Do products come with test reports?
Yes — every GreenBox product is dispatched with a factory test report signed by a qualified engineer. The report records the tests performed, the results measured, and the engineer who conducted and verified the testing. Test reports are product-specific and unit-serialised.
GreenBox products carry a 2-year warranty from date of dispatch against manufacturing defects and component failures. The warranty covers parts and labour for product repair or replacement. Site-caused damage, incorrect installation, and third-party modifications are excluded. Contact our technical team to initiate a warranty claim.
Our core products are designed to national AS/NZS standards and are suitable for use in all Australian states. However, some DNSPs have specific additional requirements for protection settings or connection documentation. We can configure protection relay settings to your specific DNSP requirements on request — please provide your DNSP’s technical standard when ordering.
Yes. We can produce custom documentation packages to meet specific DNSP, EPC contractor, or certifier requirements. This includes custom-format test reports, additional circuit diagrams, as-built documentation, and compliance certificates referencing specific project details. Custom documentation requests should be specified at time of order.
Contact our technical support team immediately. We will assess the failure mode remotely before arranging a return-to-base inspection or dispatching a replacement. Confirmed manufacturing defects within warranty are resolved at no charge. Our technical team can also provide phone or email support for commissioning issues during initial installation.
Yes. Our commissioning engineers can attend site for injection testing, protection relay commissioning, and functional verification of installed GreenBox equipment. On-site support is available across Victoria, New South Wales, and Queensland with scheduling available for other states. Contact us to discuss requirements and pricing.
Standard products from our catalogue typically have a 5–10 business day lead time from confirmed order. Custom-engineered products, including bespoke switchboards and modified protection boards, require an engineering design phase and typically have a 3–6 week lead time depending on complexity. We confirm lead times at point of order.
GreenBox products are designed to Australian standards and are generally compatible with any compliant components from reputable manufacturers. Our ATS boxes are specifically engineered for Fronius inverter platforms. For other inverter makes or custom integration requirements, contact our engineering team to confirm compatibility before ordering.
Scroll to Top